Excavating
Once the road was done, we began digging the foundation, and the
trenches for water, power, sewer, etc. It took a full week of work with an
"excavator" to get everything dug out. An amazing amount of rock came out of the
foundation.
|
|
|
|
|
|
|
This is an "excavator". You can attach either a shovel or a pneumatic hammer to the end of the arm. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Our wastewater disposal area - after excavating and before the fill has been added. |
|
|
|
|
|
|
|
|
|
|
|
|
Laying pipes in the foundation. |
|
|
|
|
|
|
|
|
|
|
|
|
An overview of our homesite after excavating. The white powder is limestone scraped off the side of our road, not snow ! |
|
|
|
|
|
|
|
|
|
|
Click on any picture for larger version.
Copyright © 2003 Steven and Kathryn London